Use these links for submittal requirements and permit type details.
When is a building permit required? Building Permit Applications
View Fire Restrictions in Effect
All Larimer County Administrative Offices, District Attorney, Courts, Landfill, and Ranch Offices will be closed on Nov. 26, 2026, to celebrate the Thanksgiving Holiday. On November 27, Larimer County Administrative Services, District Attorney, and Ranch Offices will remain closed. The courts will be open until noon that day, and the Landfill will be open.
When is a building permit required? Building Permit Applications
If applying for batteries only for a solar system that has already been installed, this cannot be applied for as a solar permit. If the battery system is under 40kwh, AND is located outside of the home (it can be in an attached garage, outside, barn, etc.) THEN it can be applied for as a Miscellaneous Electrical permit. Please specify the kWh and specific location in the work description when applying and upload a copy of the plans.
Please refer to the Land Use Code - Signs for guidelines and standards. Reach out to Planning at 970-498-7679 for clarifying questions.
When applying for building permit provide 3 full sets of: Sign Application, Plot Plan (distances, lot lines, setbacks shown), Engineered Plans.
If applying for batteries only for a solar system that has already been installed, this cannot be applied for as a solar permit. If the battery system is under 40kwh, AND is located outside of the home (it can be in an attached garage, outside, barn, etc.) THEN it can be applied for as a Miscellaneous Electrical permit. Please specify the kWh and specific location in the work description when applying and upload a copy of the plans.